Building in Heinsberg means having someone on the site who answers to you

Between the building permit and the front door key lie hundreds of decisions that nobody can see once the plaster and the cladding are on. We represent you on the site, check every build stage while it is still open, and keep track of dates, costs and defects.

On site
Heinsberg and the Kreis Heinsberg district
Field
Building construction and structural engineering
Chamber
Chamber of Engineers NRW, number 730097
Site supervisor in a safety helmet, glasses and an orange high visibility vest standing on a building site
The site is where it is decided whether the design was actually built

The open moment

Once it is closed up, nobody checks it again

Reinforcement disappears into concrete, the vapour barrier behind the lining, pipework into the screed. Every one of those steps can only be judged afterwards at considerable cost. Site supervision therefore means, above all, standing on the site at the right moment.

Deep excavation with timber shoring, bracing and workers in high visibility clothing on the base
The open state
Reinforcement, bearings, waterproofing and insulation are inspected before the next trade covers them. What can still be changed at that moment costs hours instead of weeks.
The sequence
Trades that block one another are the most common reason a site stands still. We order the sequence so that the dry lining is not waiting on a pipe that has not been laid.
The record
Every observation is written down and backed by a photograph. If something later turns out to deviate, it is clear when it arose and who is answerable for it.

One quick question

Your shell construction starts soon? Two sentences are enough for a first conversation.

Request site supervision

Build stages

One build in six stages

Site supervision is not a single appointment but a sequence of stages, each with its own check points. This is how it looks on a house in the Kreis Heinsberg district.

Stage 01

Start on site

Setting out, excavation and base slab. We check that the building is going up where the site plan puts it and that the ground actually found suits the planned foundation.

Stage 02

Shell construction

Reinforcement, concrete, masonry and floor slabs. Positions are checked against the structural design, the quantities built are measured, and each pour is released only after inspection.

Stage 03

Roof and envelope

Roof structure, covering, windows and waterproofing. This is where it is decided whether the house is tight, and where a missed inspection later costs most.

Stage 04

Fit out

Screed, plaster, dry lining and tiling. Levels, junctions and transitions are checked, along with the order in which the trades follow one another.

Stage 05

Building services

Heating, ventilation, plumbing and electrics are checked against the design before screed and cladding close the runs away for years.

Stage 06

Handover

A walk through with you, defects recorded in a list with deadlines, remedial work checked afterwards, and the documents handed over for your building file.

Scope

What the supervision covers for you

The scope is agreed in writing before work begins and follows your project. These points are normally part of it.

Site visits
Appointments follow the build sequence rather than a fixed rhythm, before every release and at every point where something is closed up.
Checking against the design
The work is held against drawings, position plans and the structural design. Departures are raised while they are still departures and not yet defects.
Programme
A sequence that sorts the trades, and the follow up as soon as a date begins to slip.
Coordinating the trades
One point of contact for everyone involved, so that agreements are not lost on the telephone between two firms.
Measurement and invoice checking
What was actually built is what gets measured. Interim invoices are held against the measurement, the contract and the real progress before you pay.
Documentation
Notes, photographs and observations for each visit, sorted by build stage and available to you at any time.
Defect tracking
Recorded defects go to the firm responsible with a deadline and are followed up until they are put right.
Handover
Preparation of the handover, a joint walk through, the record of it, and the documents collected for your building file.

Design, building submission documents and structural calculations come from the same practice. Someone who calculated the positions spots more quickly on site when the work departs from them.

Enquiry

Tell us briefly about your building site

Your name, a telephone number and a few sentences are enough. We come back to you, tell you which scope suits your project and what it would cost.

Telephone
+49 2432 907 93 00
Office address
Leichweg 3, 41849 Wassenberg
Office website
ks-ingenieur.de
Response
On working days, usually within one working day.

The enquiry commits you to nothing. You receive the scope of services and the HOAI fee in writing before anything is instructed.

Your building site in brief

The practice

Who comes to the site

Smoku eG is the engineering practice of Konrad Smoczynski in Wassenberg, around twenty minutes from Heinsberg. What arrives on the site is not a changing team but the engineer who knows the documents.

Degree
Master of Science RWTH, civil engineering
Chamber of Engineers NRW
Membership number 730097
Qualified structural design engineer
Authorisation number QT1542
Authorised to submit building documents in NRW
Authorisation number V3693
Professional indemnity
VHV Allgemeine Versicherung AG, Dortmund, cover for Germany

Check points

The points we look at closely

These places decide tightness, structural safety and later costs. Every one of them can only be judged while it is still open.

Two carpenters erecting the still open roof structure of a house
  1. Foundation and base slab

    Ground conditions, blinding layer, damp proofing and the position of the service penetrations, before the base slab is poured.

  2. Reinforcement

    Bar diameters, spacing, laps and concrete cover against the position plan, before every release to pour.

  3. Bearings and lintels

    Bearing lengths, props and lintels over openings, which are no longer accessible once the masonry is finished.

  4. Airtightness

    Junctions of the vapour barrier at walls, windows and penetrations, before the roof slope is lined.

  5. Thermal bridges

    Insulation at roller shutter boxes, parapets, balcony junctions and basement ceilings, which is where it is missing most often.

  6. Waterproofing

    Transitions at door thresholds, terraces and plinths, where water otherwise finds its way inside.

  7. Service routes

    Chases, openings and runs against the structural design, so that nothing is cut away from a load bearing section that is needed.

One quick question

In the middle of the shell and unsure whether it is right? Call us and we will clear it up quickly.

Request site supervision

Images

Pictures from the site

Five situations in which site supervision happens: the shell under scaffolding, checking against the drawing, measuring, a lintel over an opening, and the walk through before handover.

Row of houses under construction behind scaffolding, the facade still wrapped and open
Shell under scaffolding Stage 03
A finger pointing to a dimension line on a floor plan spread out on a table
Checking against the drawing Against the design
Hands measuring the reveal of a wooden window frame with a steel rule
Measuring on site Measurement
A steel beam acting as a lintel over a wide opening in blockwork, supported on props
Lintel over the opening Check point
Person in a safety helmet with a clipboard walking through a finished plastered interior
Walk through before handover Stage 06

The photographs show typical building states and the check points described. They do not depict individual projects of the practice.

Area

Heinsberg and the Kreis Heinsberg district

Site supervision needs short distances. From the office in Wassenberg it is around twenty minutes to Heinsberg, and the sites we visit regularly lie within that radius.

Places where we supervise building sites

  • Heinsberg
  • Oberbruch
  • Dremmen
  • Kirchhoven
  • Karken
  • Unterbruch
  • Randerath
  • Waldenrath
  • Grebben
  • Porselen
  • Lieck
  • Wassenberg
  • Hückelhoven
  • Geilenkirchen
  • Waldfeucht
  • Gangelt
  • Selfkant
District town
Heinsberg
District
Kreis Heinsberg
Office
41849 Wassenberg

If your site lies outside that radius, do talk to us. Whether regular visits still make sense depends above all on the distance.

Questions

What clients in Heinsberg ask first

Seven answers to the questions that come up most often before an instruction.

Imprint

Details under section 5 of the German Digital Services Act

Smoku eG, Ingenieurbüro Konrad Smoczynski

Leichweg 3

41849 Wassenberg

Deutschland

Represented by

Vorstand: Konrad Smoczynski

M. Sc. RWTH Konrad Smoczynski, civil engineer

Contact

Telephone: +49 2432 907 93 00

Email: info@ks-ingenieur.de

Website: https://ks-ingenieur.de

Responsible for editorial content

M. Sc. RWTH Konrad Smoczynski

Leichweg 3, 41849 Wassenberg

Professional title and professional regulations

Professional title: civil engineer, awarded in the Federal Republic of Germany

Qualified structural design engineer, authorisation number QT1542

Authorised to submit building documents in North Rhine-Westphalia, authorisation number V3693

The Engineering Act, the Chamber of Engineers Act, the professional code and the HOAI fee scale apply.

Supervisory authority

Ingenieurkammer Bau NRW

Zollhof 2, 40221 Düsseldorf

Membership number: 730097

Professional indemnity insurance

VHV Allgemeine Versicherung AG

Westfalendamm 223, 44141 Dortmund

Geographic scope of cover: Deutschland

VAT identification number

VAT identification number under section 27a of the German VAT Act: DE455004862

Dispute resolution

We are neither willing nor obliged to take part in dispute resolution proceedings before a consumer arbitration body.

Liability for content and links

The content of this page was prepared with care. We cannot accept liability for its accuracy, completeness or currency.

The operators of linked pages are responsible for their content. At the time the links were set, no infringements were apparent.

Privacy notice

Controller

M. Sc. RWTH Konrad Smoczynski, Smoku eG, Ingenieurbüro Konrad Smoczynski, Leichweg 3, 41849 Wassenberg

Telephone: +49 2432 907 93 00. Email: info@ks-ingenieur.de

Visiting this page

This page consists of static files. When you open it, your browser transmits technically necessary data to the server, including IP address, time, the file requested and the browser identifier. That data serves delivery and the security of the service. The legal basis is Article 6(1)(f) GDPR.

Enquiry form

When you send the form, your name, your telephone number, optionally your email address and your notes about the site go to the Olumax platform, which operates this page technically and passes the enquiry to the practice. We process the details solely in order to answer your enquiry. The legal basis is Article 6(1)(b) and (f) GDPR.

The details are deleted as soon as they are no longer needed for processing and no statutory retention period stands in the way.

Cookies

This page sets exactly one cookie, named site_lang. It stores the language you have chosen and expires after one year. It is strictly necessary under section 25(2)(2) TDDDG. There is no analytics and no advertising.

When the start page is opened, the stored value is read. If it holds en, pl or ru, you are taken once to the page in that language. If it holds de, an unknown value or nothing at all, you stay on the German page. The language pages never forward; on opening they only write their own language code.

No third parties

There are no analytics services, no advertising networks, no fonts from external servers and no embedded content from other providers.

Your rights

You have the right to information, rectification, erasure, restriction of processing, data portability and objection. Please write to info@ks-ingenieur.de.

You may also complain to a data protection supervisory authority, in North Rhine-Westphalia to the State Commissioner for Data Protection and Freedom of Information.

Cookie notice

This page sets a single cookie, and only because your choice of language would otherwise be lost on every visit.

site_lang

Name: site_lang. Purpose: to remember the language you chose. Lifetime: one year. Path: the whole site. SameSite: Lax.

The start page reads this value. With en, pl or ru you are taken once to the page in that language. With de, with an unknown value and with no cookie you stay on the German page. Every language page writes its own code on opening and never forwards.

A notice rather than a gate

A cookie that stores nothing but a choice you made yourself is strictly necessary. Under section 25(2)(2) TDDDG it needs no consent. That is why you see a notice and not a prompt that blocks the page.

Deleting it

You can delete the cookie in your browser at any time. Without it the start page shows the German version. You can choose the language at any time at the top of the page.